Low Cost PE Film Covering Prefabricated Multispan Greenhouse Hot Sale
Multi-span tunnel with plastic film greenhouse is applicated to the cultivation of vegetables and fuits,such as starwberry,hamimelon,and tomato.Comparing with single-span greenhouse,Multi-span greenhouse increases land using efficiency, can be used in more planting and breeding.The temperature distribution in the Multi-span greenhouse is uniform and the variation is gentle,and inside the greenhouse can be carried out small mechanized operations, easy to management.
.Vegetable cultivation
.Flower cultivation
.Fruits such as grape,strawberry,watermelon,orange etc,.
.Forestry seeding cultivation,planting ornamental tree and shrub.
Item | Parameter |
Width | 6-10m(8m is standrad) |
Length | 60-100m |
Shoulder Height | 3-4.5m |
Top Height | 4.8-6m(Depend on width) |
Covering material | PE film(0.08/0.10/0.12/0.15/0.2mm),PC Film |
Framework | Hot galvanized steel pipe |
Basic equipment | Framework, ventilation on both sides |
supporting system(customize) | Cooling system & irrigation system... |
Arch distance | 1.33m |
Arch Size | φ25x1.5mm,φ32x1.8mm,φ48x2.0mm |
Main pillar | φ60x1.8mm,50x70mm,80x80mm,100X100mm |
Our company also have high-quality Greenhouse related Products.
Such as Irrigation system(sprinkler irrigation,drip irrigation),Cooling system,Seedingbed and Hydroponic solusion.
Function feathers of curtain—fan cooling system :
Model :1380*1380*400cm, Power:380w,Machine Wind Capacity:45000m2/H
Adaptable size :60*80m2 ,Blade diameter:710mm
Blade speed: 440r/min,Motor speed:1250r/min
Air quantiy: 760m3/min, Noise:<65dB,Input power: 1.1Kw, Voltage:380V,50Hz
Good cooling effectiveness— Curtain has little wind drag and efficient evaporation rate. It can withstand high overcurrent wind speed,which allows more air to pass through and be cooled down per unit area.
Wet purify air—The air enters the greenhouse through the curtain is more humid,more leisure and more suitable for the growth of crops.
Assemble easily Low cost— Curtain-fan system provides a simple and cost-effective cooling way, and the needed mechanical part is just the pump and exhaust fan.
Temperature ensure —If outside is about 30 ℃. Indoor temperature no more than 20℃ equipped with fans.
We have elaborate packing&trusted shipping ways to ensure the security.
Packaging and delivery
Customers can choose air, rail or transport as a practical situation.
Delivery time:
Send within 15 days after payment
Port: Shanghai/ Guangzhou/ Tianjin
Lead time: 10 days after payment
Our Service:
- Professional greenhouse solution provider
- Good after-sale service.
- Customized Service
- 24 hours Online Service
- Easy Payments--T/T, Western Union, Paypal, etc.
Greenhouse Optional Systems:
We provide different greenhouse equipment to promote the efficient use of greenhouses. Such as cooling systems, irrigation systems, hydroponic systems, shading systems and ventilation systems. You can choose according to your weather condition.
How To Build A Greenhouse?
1. Before your installation, we will provide you with one-to-one professional drawings.
2. We also provide engineers with direct door-to-door instruction and installation services. All the air tickets, accommodation, meals and other expenses of the engineers need to be borne by you. The engineer's fee is USD100/ person/ day.